What is LEED Commissioning?
Let's be clear about this, "Commissioning" as LEED and the USGBC has set forth is not to be confused with a standard commissioning process as defined by ASHRAE Guideline 0 (Zero). There are many different ways that you can serve up commissioning, but they should always be defined in your work scope so that everyone's expectations can be met. So let's take a look at how the LEED commissioning process looks when the project is a new building. The LEED scorecard for a new building has two different line items one is commonly refered to as Basic Commissioning and Enhanced Commissioning.
Please note that the following is a description of the commissioning credits prior to LEED version 4. Always refer to the LEED Guidebook for exact definitions.
Basic
Basic Commissioning is a prerequisite according to the scorecard and it is what I call the meat and potatoes of the commissioning process. Usually perfomed around the end of construction this is the "must have" when it comes to commissioning. This is the time when the commissioning authority verifies that what the building designer laid out is functioning the way that it should. According to the LEED guidebook Basic commissioning requires the following:
Assist with the OPR (Owner's Project Requirements)
Make sure the BOD (Basis Of Design) is being developed by the design team
Review the OPR and the BOD to make sure that they are in agreement
Verify that commissioning requirements are included with the construction documents
Develop a Commissioning Plan
Verify the installation and preformance of the commissioned systems
Perform functional testing on commissioned systems
Issue a Commissioning Report
Enhanced
Enhanced Commissioning is for credit in the LEED rating system. Its involvement is during what I like to call the bookends of the project because it includes the design and post occupancy components as well as additional construction involvement. According to the LEED guidebook Enhanced commissioning requires the following in addition to all the Basic Requirements:
Perform a 50% Construction Document Review
Review submittals of commissioned systems
Produce a systems manual for commissioned systems
Verify training requirements are complete
Participate in the "11-mo" walk through (LEED says 8-10 month) but the intent of this is to review the building operations with the owner prior to the standard 12-month contractor warrenties expire.
Systems to be Commissioned
The minimum systems that should be commissioned to meet the LEED requirements:
HVAC systems and controls
Lighting and Lighting Controls
Domestic Hot Water
Renewable Energy Systems